National Network of Regional Coastal Monitoring Programmes
Note that these are real-time data and are not quality-controlled. Long-range graphs are plotted from a randomised subsample of half-hourly data.
Port Isaac
Tide Levels and HarmonicsAdditional Information
Step gauge location | 50° 35.651' N 004° 50.065' W |
Met station location | 50° 35.408' N, 004° 49.426' W |
Storm threshold | 3.0 m |
For full site history | See latest annual report |
Wave and tide data are measured using an Etrometa step gauge which became operational on 15 July 2010.
The gauge is situated on the outer breakwater by kind permission of Port Isaac Harbour Commissioners. The shore station is kindly hosted by George Cleave Fish Merchants and Seafood School.
The primary purpose of the step gauge at Port Isaac is as a tide gauge, but the instrument also measures waves. Some wave reflection from the sea wall is to be expected, but a reasonable estimation of wave height is anticipated.
Meterological data are measured using a Vaisala WXT536, which was first installed on 04 May 2022.
20/04/2024 | The tide gauge is offline. An investigation is underway. |
10/02/2024 | The tide gauge is currently offline due to maintenance works on site. Scheduled service. |
15/01/2024 | The computer has been replaced. |
21/12/2023 | The site is offline due to an issue with the computer. |
11/12/2023 | The site is offline due to fault on the BT line. A BT engineer will visit site asap. |
22/11/2023 | It is suspected that a physical fault with one of the lower Etrometa sections is introducing spikes in the data. This will be investigated when tides next allow. |
08/06/2023 | Scheduled service |
29/09/2022 | A fault in EE communications is preventing data transmission from the meteorological station. This will be resolved as soon as possible. Update: Transmission of all met parameters was repaired on 04/11/2022. |
13/08/2022 | Scheduled service. |
15/07/2022 | The 4G connection issue has been resolved. |
24/06/2022 | An issue with the 4G connection has interrupted data flow. |
04/05/2022 | A Vaisala 536 meteorological station was installed at the site. |
17/09/2021 | The brackets have been replaced and the Etrometa was serviced. |
13/09/2021 |
The brackets that hold the Etrometa sections in place are being replaced. We are aiming to complete the works and bring the tide gauge back online by 17/09/2021. |
11/05/2020 | Scheduled service including remedial works replacing Etrometa section and the solar array. |
25/02/2020 | Electrical works on site mean the power will be off until 26/02/2020. |
05/12/2019 | Unscheduled visit to replace PC at shore station. |
01/09/2019 | Unscheduled visit following data outage. The bottom two Etrometa sections were swapped out. |
02/08/2019 |
Structural survey to evaluate the condition of the instrument as it is nearing the end of its 10 year use life. Based on the conclusions of the report, the site's life will be extended for another 10 years by replacing the bracketing. |
04/07/2019 | Scheduled service |
25/01/2019 | Scheduled service |
12/07/2018 | Scheduled service |
05/11/2017 | Scheduled service |
26/06/2017 | Scheduled service and shore station relocated within the same building. |
14/12/2016 | Scheduled service and loss of data investigation. BT line fault was found and fixed. |
22/03/2016 | Scheduled service |
29/10/2015 | Scheduled service |
17/07/2015 | Unscheduled visit to replace navigation light and solar panel on the western breakwater. |
30/04/2015 | Scheduled service |
11/11/2014 | A power cut last night has stopped data transmission. Ongoing power issues will be resolved asap. |
28/10/2014 | Scheduled service |
29/04/2014 | Scheduled service |
13/10/2013 | Scheduled service |
19/07/2013 | Unscheduled visit to shore station to reconfigure PC and router. |
23/10/2013 | Scheduled service |
25/04/2013 | Scheduled service |
18/10/2012 | Scheduled service |
15/06/2012 | Unscheduled site visit to swap out faulty PC |
23/03/2012 | Scheduled service |
13/12/2010 | Scheduled service |