National Network of Regional Coastal Monitoring Programmes
« Return to map for other wave, tide and met stations.
Note that these are real-time data and are not quality-controlled. Long-range graphs are plotted from a randomised subsample of half-hourly data.
Start Bay
Additional Information
Wave buoy location | 50° 17.53' N 003° 36.99' W |
WMO code | 6201002 |
Approximate water depth | 10 m CD |
Approximate spring tidal range | 4.4 m |
Storm alert threshold | 2.98 m |
Wave data are measured using a Datawell Directional WaveRider Mk III buoy. The buoy was first deployed on 05 April 2007, at which time the magnetic declination at the site was 3.2° west, changing by 0.15° east per year. Wave direction is reported following the nautical convention, meaning that the direction is where the waves come from, measured clockwise from magnetic north.
10/05/2024 | Scheduled service |
24/08/2023 | Scheduled service |
27/08/2023 | Data are currently delayed due to a router issue. An investigation is underway. |
03/02/2023 | Scheduled service |
07/11/2022 | An issue at the shore station has interrupted the data feed. This will be resolved asap. Update: The feed was restored on 08/11/2022 and the data is backfilling. |
29/05/2022 | Scheduled service |
18/01/2022 | During a visit to the shore station, the 4G communications system was updated and the computer replaced. Data has been restored. |
07/01/2022 | No data is reaching the website due to network issues. Investigations are ongoing. |
11/11/2021 | The buoy has been redeployed. |
06/11/2021 | The buoy was set adrift and recovered the same day. Redeployment will be at the earliest opportunity. |
12/10/2021 | Scheduled service |
18/03/2021 | Scheduled service |
30/11/2020 | The buoy was redeployed. |
03/11/2020 | The buoy was sent adrift and recovered on the same day. |
12/05/2020 | Scheduled service |
17/12/2019 | Scheduled service |
02/06/2019 | Scheduled service |
06/09/2018 | The buoy has been serviced and re-deployed |
10/08/2018 | The buoy has come adrift. Rescue operations are under way. The buoy was recovered later this day |
05/05/2018 | Scheduled service |
25/05/2017 | The connection has been restored. |
23/05/2017 | Due to technical problems at the shore station, no data is being received. The issue is being investigated. |
04/01/2017 | Scheduled service |
21/08/2016 | Issues with the phone line at the shore station are preventing data upload. BT have been contacted. |
06/07/2016 | Scheduled service |
29/01/2016 | Power has been restored to the shore station following a power cut and data are now coming through again. |
28/01/2016 | No data have been received from the buoy since yesterday morning. It is believed to still be on site but there is currently no response from the shore station. |
16/01/2016 | Scheduled service |
16/06/2015 | Scheduled service |
31/03/2015 | A problem with the phone line is preventing data being uploaded. A BT engineer has been called. |
08/09/2014 | Scheduled service |
13/03/2014 | Scheduled service |
04/09/2013 | Scheduled service |
09/03/2013 | Scheduled service, buoy replaced for painting |
23/08/2012 | Scheduled service |
24/02/2012 | Scheduled service |
10/11/2011 | Scheduled service |
31/07/2010 | The buoy has been cut adrift |
12/05/2010 | Scheduled service |
30/11/2009 | Scheduled service |
28/05/2009 | The buoy has been serviced and re-deployed |
21/05/2009 | The buoy has been reported near West Bay and kindly recovered by a local fisherman and Lyme Bay Sea School |
11/03/2009 | Scheduled service, hull swapped for battery change and painting |
25/02/2009 | Scheduled service |
04/08/2008 | Buoy adrift, recovered 8nm off Start Point, serviced and re-deployed |
12/03/2008 | Phone line and internet down, damaged in storm. BT repaired phoneline |
26/01/2008 | Scheduled service |
23/07/2007 | Buoy adrift, severed by propellor |
09/05/2007 | Buoy adrift, recovered and re-deployed |